The schedule your customer is billed against — and the cost model underneath it.
What goes on a rate card, where each number comes from, and why two warehouses quoting the same service can both be right and still be far apart.
Looking for warehouse worker pay rates? This page is about the commercial rate card — the charges a 3PL bills its customer. For employee award wages, the Storage Services and Wholesale Award is published by the Fair Work Ombudsman.
A warehouse rate card is the schedule of charges a third-party logistics provider bills a customer against. Storage per pallet per week. Picking per carton, line or order. A fixed weekly management fee. Consumables at cost plus a margin. Labour by the hour for anything outside scope.
It is the commercial face of a cost model. Every line on it should trace back to a real cost in the operation, and every line should be defensible when a customer asks where the number came from — because sooner or later, one will.
Almost every Australian warehouse contract is built from five families. What varies is which lines are switched on and how granular the activity rates get.
| Rate type | Charged on | Covers |
|---|---|---|
| Storage | Per pallet per week or month | Rent, outgoings, insurance, racking — the cost of holding stock. |
| Activity | Per pallet, carton, line, order or container | The variable labour of doing the work: receive, putaway, pick, pack, despatch. |
| Fixed weekly / monthly | Per week or month | Site management, supervision, IT and systems — cost that does not move with volume. |
| Cost-plus | Actual cost + agreed margin | Consumables, pallet hire, freight recovery — pass-through items. |
| Labour rate | Per hour | Ad-hoc and out-of-scope work, at the fully loaded cost of an FTE plus margin. |
A more granular seven-line breakdown, including pallet management and manual charges, is in 3PL Rate Card Template Australia.
Indicative only — these are illustrative figures for an ambient outer-metro site, not a benchmark to price against. The point is the shape, not the numbers.
| # | Line | Rate type | Unit | Rate (ex GST) |
|---|---|---|---|---|
| 1 | Pallet Storage | Storage | Per pallet / week | $5.80 |
| 2 | Putaway per Pallet | Activity | Per pallet | $4.25 |
| 3 | Order Picking | Activity | Per order | $6.90 |
| 4 | Item Line Pick | Activity | Per line | $0.95 |
| 5 | Packing per Carton | Activity | Per carton | $1.10 |
| 6 | Site Management Fee | Fixed weekly | Per week | $3,200 |
| 7 | IT Systems Fee | Fixed weekly | Per week | $230 |
| 8 | Consumables | Cost-plus | Per month | $1,450 |
| 9 | Additional Labour | Labour rate | Per hour | $40.62 |
A rate is not chosen. It is the result of a division: a pool of cost, divided by the volume that drives it.
Worked end to end, with the full cost stack and the arithmetic, in Rate Card Pricing: From Cost Pools to Per-Unit Rates.
There is no standard warehouse rate, and a rate card copied from another operator is close to worthless. A rate is the output of a specific operation:
The schedule of charges a 3PL bills a customer against — storage, activity rates, fixed fees, cost-plus items and hourly labour. It is the commercial expression of the provider's cost model.
Each cost is sorted into a pool, then each pool is divided by the volume that drives it. Overhead and margin are applied on top as a separate layer.
Because a rate is the output of a specific operation, not a market price. Rent, density, labour agreement, shift pattern and the customer's order profile all change the underlying cost.
At every renewal at minimum, from actual captured volumes rather than the original forecast — and monitored continuously in between.
CostAware builds the card from your cost model — every line traceable back to the work behind it, and rebuildable in any shape without losing a cost.